Automatic Frame Assembly Machine by Equipment Department
2024-08-27 Classification: News Reading frequency:
In June 2024, the Photovoltaic Production Department's module division received orders for LEAD ROAD and Guangzhou Weihongcheng. The manual framing process required workers to use hammers to assemble the frames, resulting in low productivity and occasional defective assemblies. With tight deadlines, there was an urgent need for an automatic framing device to ensure normal production and reduce defective products. With strong support from company leadership, the equipment group overcame various difficulties, including hardware issues, by continuously simulating and calculating. Utilizing existing old equipment parts, they independently developed an automatic frame assembly machine for the modules in just two days. This device realized the automatic framing function, resolving the issue of manual framing for irregularly shaped modules. At present, the defective rate of 1040*760 and 1722*760 version modules assembled by this automatic frame assembly machine is zero, resulting in significant economic benefits for the company.

The successful development of the automatic frame assembly machine fully demonstrates how technological capabilities and management experience can enhance the company's production level. It exemplifies the proactive spirit of CSG in independently researching and developing equipment, their innovative mindset of fearlessly overcoming challenges, and their diligent and meticulous work ethic on the front lines. Additionally, it embodies the CSG spirit of "pragmatism, innovation, unity, and efficiency" through concrete actions.
(By Su Jing, Equipment Department)
News
-
Dongguan CSG PV Tech Co., LTD Won Multiple Honors at the Guangzhou Solar Photovoltaic Exhibition, Including "2024 Excellent Photovoltaic Enterprise"
2024-08-27
-
Dongguan PV Crystalline Silicon BIPV Modules Won "Carbon Footprint Certificate" by CQC
2024-08-27
-
Successful Holding of the 2024 New Talent Meet-and-Greet at Dongguan CSG PVTech Co., LTD
2024-08-27
-
Dongguan Trade Union's 2024 Summer Cooling Activity in Dongguan PV
2024-08-27
-
Leading the New Era of Green Energy | Dongguan CSG PVTech Co., Ltd. with Multiple BIPV Products at the Munich International Smart Energy Expo
2024-08-27
-
2024 Fire Emergency Evacuation Drill
2024-08-27
-
Automatic Frame Assembly Machine by Equipment Department
2024-08-27
-
Dongguan CSG PVTech Co., Ltd. in SNEC PV+2024 PV Two Sessions
2024-08-27
-
CSG-PVTech held the launch meeting for the 2024 "Safety Month"
2024-06-07
-
Double Certification Achievement! - CSG-PVTech has achieved TÜV North Germany's IEC New Standard Certification for BIPV products.
2024-06-07


